TUNNELS BRIDGES ROADS STEEL FABRICATED BRIDGE BORDER FENCING BUILDING MACHINES
For Tunneling work either for “D” or for “Elliptical Section” steel rib supports with specific degree of deviation are required to be fabricated.
In addition for gauge conversion from narrow gauge to broad gauge steel bridge girder in different spans of 12.2/18.3.30.5/61m span are required to be fabricated. On being awarded contracts by NF railway for tunneling as well as bridge girders ABCI have developed expertise in fabrication, transportation, dismantling of existing girder and erection of new girders. These are very specialized and sophisticated job.
 
KHOWAI
MANNU
 
     
 
© 2011 ABCI Infrastructure pvt. ltd.. All rights reserved.