Border Roads Organisation(BRO)


1

Construction of Road Munsiari-Bugdiar-Milan to CL-9 (N)

Construction of Road Munsiari-Bugdiar-Milan to CL-9 (N) Surfaced specifications sector from Km 3.010 to 35.0000 ( Net Length 31.990 Km). CA No. 80263/Munsiari-Milan/2009-10/20 dt.10-07-2009 & as per revised ammendment as on 28-09-2017

2

Rehabilitation and upgradation to 2 lane / 2 lane with paved shoulder configuration for design chainage

Rehabilitation and upgradation to 2 lane / 2 lane with paved shoulder configuration for design chainage km 107.347 to km 129.208 & km 133.878 to km 138.570 (existing chainage km 110.000 to km 133.020 & km 137.330 to km 142.028) and land slide treatment at existing km 138.500 (Design chainage km 134.970) of NH -94 on EPC mode under improvement to NH connectivity to Chardham in the state of Uttarakhand (Design Length = 26.553 Km) CA dated 05 september 2018, LOA No. 85003/CHARDHAM/KM110-142/EPC Cell dated 21-08-2018

3

Design and Construction/ Improvement of Balipara-Charduar- Tawang Road

Design and Construction/Improvement of Balipara-Charduar- Tawang Road From Km 70.00 to Km 88.00 (New Location from Km 69.90 to Km 87.54) from Existing Cl -9 Specifications To NH Double Lane Specifications (Formation, Permanent & Surfacing Works Including Permanent Bridges) in the State of Arunachal Pradesh. CA no. CE (P) VTK - 20 of 2018-19 , LOA no 80003/ADG (E)/ VTK/Concr / 28/ E8 dated 01 Jan 2019

4

Construction and up-gradation of existing road to 2-lane with paved shoulders

Construction and up-gradation of existing road to 2-lane with paved shoulders from existing chainage Km 65.00 to Km 76.00 (design chainage from Km 63.950 to Km 74.733) of NH-94 (New NH- 34) Rishikesh - Dharasu Road on EPC mode in the State of Uttarakhand (Design length= 10.783 Km)